A distribution box is a low-voltage distribution device that assembles switchgear, measuring surfaces, maintenance appliances, and auxiliary equipment into a closed or semi closed metal cabinet or screen according to electrical wiring requirements. During normal operation, the circuit can be connected or disconnected using manual or automatic switches. When there is a malfunction or abnormal operation, use maintenance appliances to cut off the circuit or give an alarm. By measuring the appearance of the Jiangmen distribution box, various operating parameters can be displayed, and certain electrical parameters can be adjusted. It can also provide prompts or announce signals for violating normal working conditions. Commonly used in various power generation, distribution, and substations.
In the low-voltage electrical appliance market, distribution boxes, distribution cabinets, low-voltage switchgear, and Jiangmen distribution box construction distribution boxes are the main products, which are widely used in production and daily life. Especially in recent years, people's awareness of safe electricity use has increased and urban construction efforts have continued to increase, resulting in a significant increase in demand. In the new situation, the active efforts of Jiangmen distribution box manufacturers are also important conditions for promoting healthy and rapid market development. The distribution box belongs to a type of electrical equipment, and due to its electrical connection, whether it is a device or for inspection and repair, it is necessary to pay attention to the safety of use. Distribution boxes are used in various power fields, and due to their widespread use, it is even more important to pay attention to the safety of device operation. In order to use the equipment safely, technicians need to pay attention to precautions during installation.
Indoor main distribution panels and distribution boxes should be installed in the distribution system of the construction site for graded power supply, and the capacity of each level of distribution device should match the actual load. Power and lighting should be set separately. The rated value and action setting value of the main distribution box electrical appliances should be consistent with the rated value and action setting value of the branch switch electrical appliances. And install the main automatic switch, leakage maintenance device, and branch automatic switch. The various electrical components and leakage maintenance devices used in the distribution boxes at all levels should meet the quality requirements of national standards. The leakage maintenance devices in distribution boxes at all levels should be properly installed to achieve graded and segmented maintenance effects. Distribution boxes are widely used in various power plants, distribution stations, and substations. They mainly rely on maintenance appliances to cut off the circuit and announce alarms when there is a problem or abnormal operation of the line, greatly facilitating electricity management.
Article source: Jiangmen distribution box muaizuowen.com
02-28
What are the safety technical requirements for Jiangmen substation cabinets
Assembling switchgear, measuring instruments, protective appliances, and auxiliary equipment into enclosed or semi enclosed boxes or screens forms a distribution box. What are the safety technical req
02-28
Installation environment requirements for Jiangmen substation cabinets
In the process of our practical installation, if the orientation of the distribution box is not very perfect or does not meet the requirements of the practical site, the installation personnel should
02-28
Wiring principles of Jiangmen distribution box
We cannot do without electricity. We use electricity almost every day, and electricity has become an indispensable part of our daily lives. Today, we will introduce the wiring guidelines for distribut
02-28
How to deal with the tripping of Jiangmen distribution box
Reason for tripping of distribution box:1. Check if the air switch is damaged.2. Check if the air switch wiring is correct. Incorrect and rewire.3. Check the insulation of the circuit on the load side